2014 Ross

JESSE JAMES:

ROSS 40 FT  |  SKILLS: engineering, laminate, painting  |  PROJECT DURATION: 3 weeks
A bowsprit was fabricated and installed on this Ross 40 to make is more suitable for cruising. Additionally, a retractable carbon fiber pole was built into the bow area.

2014 ROSS 2014 ROSS 2014 ROSS 2014 ROSS 2014 ROSS 2014 ROSS 2014 ROSS 2014 ROSS
2024 © Copyrights All Right Reserved By Brin Wilson.
Website Designed & Developed By Stealth Media Ltd.