Leda : a big rebuild

PROJECT DURATION: 6 months

We undertook some major repairs after Leda was involved in an incident where she received severe damage to her bow and topsides, we removed the bow section and had to rebuild and also had to repair the hole in the topsides, we also replaced the belting the boat also had a total repaint and had new engines installed which meant making up new engine beds.